Projects
In all our projects, we emphasize to the analysis that is the first phase of design process. At this stage we attempt to thoroughly understand the needs of the client or/and the user and to identify the characteristics of the site such as terrain, microclimate, view. Through this process –taking also into account budget and local laws- we compose a map with all possible restrictions.
The second phase is the conceptualisation. Τhe rich Cycladic architecture is a source of inspiration for us, and we produce ideas in the form of sketches, diagrams and 3D models. Afterwards, we choose the most suitable concept and proceed to implement it. Together with a well-organised network of partners, we are present at each stage of the project aiming for the best possible result.
List of other projects
Description | Year | Location | Work | Status | |
---|---|---|---|---|---|
1 | Reinforcement and rehabilitation of a neoclassical building at the centre of Heraklion Crete | 2004 | Heraklion, Crete | Architectural study | Completed |
2 | Complex of 29 two floor houses with basement and pools | 2005 | Foinikas, Syros | Supervision | Completed |
3 | Complex of 23 houses | 2008 | Talada, Syros | Supervision | Completed |
4 | Two floor house with garage | 2008 | Episkopeio, Syros | Architectural study / structural study / supervision | Completed |
5 | Commercial building (two floors and basement) | 2010 | Hermoupolis, Syros | Architectural study / structural study / supervision | Completed |
6 | Construction of a two floor house with basement | 2010 | Lotos Kini, Syros | Architectural study / structural study / supervision | Completed |
7 | Ground floor house with basement and water tank | 2011 | Messaria, Syros | Architectural study / structural study / supervision | Completed |
8 | Upgrading of a furnished apartment hotel at a classic 5 star hotel, with extension of a basement and construction of swimming pools | 2011 | Mega Gialos, Syros | Architectural study / structural study | Completed |
9 | Landscape architecture with swimming pool in the courtyard of a historical neoclassical building | 2011 | Poseidonia, Syros | Architectural study / structural study | Completed (Approval by the Greek Ministry of Culture) |
10 | Extension of a ground floor house and construction of three new ground floor houses | 2012 | Kouroupi, Kato Manna Syros | Architectural study / structural study / supervision | Completed |
11 | Construction of a two floor house with basement | 2013 | Kini, Syros | Architectural study / structural study / supervision | Completed |
12 | Extension of a ground floor house and Reinforcement and rehabilitation of a neoclassical building | 2013 | Episkopeio, Syros | Structural study / supervision | Completed |
13 | Luxury Villa house with basement and swimming pool | 2013 | Dani, Syros | Structural study / supervision | Completed |
14 | Reinforcement and rehabilitation of an old two floor rural building | 2015 | Episkopeio, Syros | Structural study / supervision | Completed |
15 | Construction of a two floor house | 2015 | Galissas, Syros | Structural study / supervision | Completed |
16 | Construction of a two floor house with parking | 2016 | Kini, Syros | Architectural study / structural study / supervision | Completed |
17 | Renovation and rehabilitation of two houses and landscape design with a swimming pool | 2016 | Megas Gialos, Syros | Architectural study / structural study / supervision | Completed |
18 | Design and construction of a little church | 2016 | Megas Gialos, Syros | Architectural study / structural study / supervision | Completed |
19 | Construction of a small stone house | 2017 | Delfini, Syros | Structural study / supervision | Completed |
20 | Luxury Villa house with a guest house | 2020 | Steasto Poseidonia, Syros | Topography supervision and implementation | Completed |
21 | Country house | 2020 | Fabrika, Syros | Topography supervision and implementation | Completed |
22 | Ground floor house with guest houses |
2021 | Delfini, Syros | Structural study / supervision | Under construction |